Start here
Sternwick records are built from a small set of repeated parts: a gauge entry, a sequence of steps, the setting around each reading, and a sheet that gathers the result.
Getting started
Set up the first gauge, define a cycle, and choose the fields used during a check.
Calibration steps
Move from preparation to reference points, repeat readings, deviation, and close-out.
Certificate fields
See each field on the record sheet, with a filled sample for orientation.
Reading conventions
Numbers appear in a fixed-width style. A set value and an observed value always share a unit. A deviation keeps its sign so the direction of the difference stays clear.
Sample: set 10.00 bar, observed 10.02 bar, deviation +0.02 bar.